Foreign Manufacturer Certification Scheme | FMCS Consultant

BIS (ISI) Certification for Foreign Manufacturers

Every country has its own laws and regulations regarding imports. These policies help maintain market assurance and confidence. Likewise, the Indian government offers a few certifications to ensure the safety and reliability of the products brought into the country. For goods producers outside of India, the Bureau of Indian Standards (BIS) administers the Foreign Manufacturers Certification Scheme (FMCS). International producers wishing to sell their goods in India must obtain this license confirming that they fulfil quality, safety, and reliability requirements. In India, maintaining product quality standards and safeguarding consumer interests depend heavily on the FMCS. It guarantees that the imported goods are of the required caliber and are safe for the users.

 

What is an FMCS Scheme (Foreign Manufacturer Certification Scheme)?

The Bureau of Indian Standards (BIS) launched into effect the Foreign Manufacturers Certification Scheme in 2000. After a separate certification process, the program is designed for foreign applicants and foreign producers who are authorized to use the ISI mark within six months. To guarantee that their products meet Indian standards and criteria, the program attempts to assist overseas producers in the certification process. Foreign manufacturers save money by avoiding unnecessary testing and certification, and they can also gain advantages by following this scheme, such as easier product certification, recognition of international standards for the product, increased credibility, and entry into the Indian market.

 

Who can apply for a license under FMCS?

Foreign applicants should fulfill the following requirements:

1. The manufacturing unit must be located outside of India.
2. Ensure that all products conform to the requirements of the applicable Indian Standards Specification.
3. All foreign manufacturers will be considered ‘large scale’ as per BIS FMCS norms.
4. The applicant shall confirm readiness for the factory inspection and fulfill the formalities, like availability of an English translator, arrangement of transport in the foreign country, etc., for the officer's ease so that the visit can take place as soon as possible.
5. At the factory premises, all manufacturing machinery and testing facilities as per the requirement of ISS (Indian Standard Specification) should be available.
6. The applicant (manufacturer) must accept the SCHEME OF TESTING (SIT) and annual marking fee.
7. Quality Control Personnel (QCI) must be technically qualified and able to perform the testing as per the requirement of applicable Indian Standards.
8. It is the applicant's responsibility to ensure the timely and safe deposition of the sample sealed by the BIS officer to the designated lab, and the remittance of testing charges has to be paid by the applicant/manufacturer.
9. BIS payments are to be made in equivalent USD by applicants (foreign manufacturers only). SAARC countries (Afghanistan, Bangladesh, Bhutan, Nepal, the Maldives, Pakistan, and Sri Lanka) applicants can make the payment either in Indian rupees with GST (as applicable) or in equivalent USD.
10. Foreign applicants/manufacturers must nominate an Authorized Indian Representative (AIR).
12. Performance Bank Guarantee (PBG) of USD 10,000, having a branch office in India and being RBI approved, is required to be furnished just after the grant of the license to the applicant.
13. A separate application is required to be submitted for each product/Indian Standard and each factory address.

 

Note: A BIS license is granted initially for one year and up to two years.

 

Eligibility Criteria for Acquiring FMCS License

These are the requirements one needs to fulfill while applying for FMCS:

1. Eligibility: Only foreign manufacturers, not importers or traders, are eligible for the FMCS. 

2. Standards Compliance: Items must adhere to the pertinent Indian Standards (IS) that BIS specifies. 

3. Authorized Representative: The application process requires an Indian resident representative.

4. Factory Inspection: The overseas manufacturing facility is thoroughly inspected by BIS. 

5. Testing Requirement: In labs approved by BIS, the products must pass the test. 

6. Certification Mark: The BIS Standard Mark may only be applied to goods by authorized producers. 

7. Application Process: Fill up the online application and send it in with the required paperwork and payment. 

8. License Validity: FMCS licenses are renewed annually and have a one-year validity period.

Mandatory Product List for BIS (ISI) Certification for Foreign Manufacturers

Below is a list of products that require mandatory compliance in India:

S.No. Product Name
1 Electric Bean Slicers IS 302 (Part 1) / IEC 60335-1
2 Electric Coffee Makers IS 302 (Part 1)/IEC 60335-1
3 Bullet Resistant Jackets IS 17051
4 Electric Call Bells and Buzzers IS 302 (Part 1)/IEC 60335-1
5 Electric Heating Tools under IS 302 (Part 1)/IEC 60335-1
6 Electric Forced Convection Ovens & Steam Cookers IS 302 Part 1 / IEC 60335-1
7 Massage Appliances IS 302 Part 1/ IEC 60335-1
8 Heating Liquid Appliances IS 302 (Part 1)/IEC 60335-1
9 Cooking Ranges, Hobs, Ovens, and Similar Appliances IS 302 (Part 1)/IEC 60335-1
10 Warming Plates and Similar Appliances IS 302 (Part 1)/IEC 60335-1
11 Tumbler Dryers IS 302 (Part 1)/IEC 60335-1
12 Vacuum Cleaners and Water Suction Cleaning Appliances IS 302(Part 1)/IEC 60335-1
13 Commercial Dispensing Appliances and Vending Machines IS 302 (Part 2/Sec 75)
14 Storage-Type Electric Water Heaters IS 302 (Part 2/Sec21)
15 Domestic Electric Clothes Washing Machines IS 302 (Part 2/Sec 7)
16 Fans IS 302 (Part 2/ Sec 80)
17 Skin or Hair Care IS 302 (Part 2/Sec 23)
18 Safety of Household and Similar Electrical Appliances – Range Hoods IS 302 (Part 2/Sec 31)
19 Toasters, Grills, Roasters, and Similar Appliances IS 302 (Part 2/Sec 9)
20 Insect Killers IS 302 Part-1
21 Electric Steam Cookers IS 302 (Part 1)/IEC 60335-1
22 Frying Pans, Deep Fat Fryers and Similar Appliances IS 302 (Part 1) IEC 60335-1
23 Electrical Shavers, Hair Clippers, and Similar IS 302 (Part 1)/ IEC 60335-1
24 Petroleum and Natural Gas Industries- Steel Drilling Pipes IS 19112
25 Petroleum and Natural Gas Industries -Steel Pipes for Use as Casing or Tubing for Wells IS 19111
26 Seamless Steel Tubes for Manufacturing High-Pressure Gas Cylinders Specification IS 12620
27 Petroleum and Natural Gas Industries Steel Pipe for Pipeline IS 3183
28 Cast Iron Specials for Mechanical and Push-on Flexible Joints for Pressure Pipes for Water, Gas, and Sewage -IS 13382
29 Cast Iron fittings for pressure pipes for water, gas, and sewage - IS 1538
30 Horizontally cast iron double flanged pipes for water, gas, and sewage -IS 7181
31 Spiral Welded Pipes Specification - IS 5504
32 Countersunk Flat Head Screws Type H or Type Z Cross Recess Grade A (Part 1) Steel Screws of Property Class 4.8 IS 7485 (Part-1)
33 Plain Bearings Ring Type Thrust Washers Made from Strip IS 9764 (Part 1)
34 Aluminium Alloy Redraw Rods for Electrical Purposes IS 9997
35 Aluminium Alloy Hardeners (Master Alloys) IS 2047
36 Aluminium Alloy Milk Can IS 1825
37 Porous Metal Powder Oil Impregnated Bearings IS 3980
38 Plain Bearings Pressed Bimetallic Half Thrust Washers IS 9764 Part 2
39 Ring Type Needle Bearings IS 4215
40 Plain Bearings -Thick - Walled Bushes, Plain and Flange Type, Full -Round (Without Any Joint Or Slit) IS 14478
41 Thin-Walled Plain Bearings IS 10203
42 Double Row Cylindrical Roller Bearings IS 6458
43 Single Row Cylindrical Roller Bearings IS 6457
44 Double Row Radial Ball Bearings IS 6456
45 Single Row Deep Groove Ball Bearings IS 6455
46 Self-Aligning Roller Bearings IS 6454
47 Mini Domestic Water Heater for Use with Piped Natural Gas (PNG) IS 17150
48 Tin Ingot IS 26
49 Primary Lead IS 27
50 Refined Nickel as per IS 2782
51 Refined Zinc IS 209
52 Countersunk Head Wood Screws – Specification IS 18509
53 Chipboard Screws – Specification IS 18508
54 Drywall Screws IS 18507
55 Raised countersunk head screws (Common Head Style) with type H or type Z cross recess – Product grade A IS 7486
56 Countersunk flat head screws (Common Head Style) with type H or Type Z Cross Recess – Product Grade A part 2 Steel Screws of Property Class 8.8, Stainless Steel Screws and Non – Ferrous Metal Screws IS 7485 (Part 2)
57 Pan Head Screws With Type H or Type Z Cross Recess – Product Grade A IS 7483
58 Cross Recessed Tapping Screw Raised Countersunk Oval Head IS 18480 (Part-3)
59 Cross Recessed Tapping Screws Part 2 Countersunk Flat Head IS 18480 (Part 2)
60 Rolling Bearings Accessories Dimensions for Locknuts and Locking Devices IS 16605 Part-2
61 Cross Recessed Tapping Screws: Part 1 Pan Head IS 18480
62 Fasteners – Hexagon Washer Head Drilling Screws with Tapping Screw Thread IS 18476
63 Fasteners – Cross Recessed Drilling Screws with Tapping Screw Thread Raised Countersunk Head IS 18471 Part 3
64 Fasteners – Cross Recessed Drilling Screws with Tapping Screw Thread Part 2 Countersunk Head IS 18471 Part-2
65 Fasteners Cross Recessed Drilling Screws with Tapping Screw Thread Pan Head IS 18471 (Part 1)
66 Tapered Roller Bearings IS 12102
67 Round Steel Wire Rope Used As Balance Ropes Mines IS 18532
68 Plummer Block Housings IS 14347
69 Rolling Bearings Accessories IS 16605 Part-1
70 Bicycle Balls IS 15184
71 Needle Roller for Rolling Bearings IS 4217
72 Cylindrical Rollers for Rolling Bearings IS 9202
73 Ceramic Balls For Rolling Bearings IS 2898 Part-2
74 Steel Balls for Rolling Bearings IS 2898 Part-1
75 Bunk Beds IS 17636
76 Beds IS 17635
77 Storage Units - IS 17634
78 Tables and Desks Furniture IS 17633
79 General-Purpose Chairs and Stools IS 17632
80 Work Chairs Furniture IS 17631
81 Flashlight IS 2083
82 Appliances for Electric Instantaneous Water Heaters IS 302 (Part 2/Sec 35)
83 Electric Fence Energizers — IS 302-2-76 (Mandatory under QCO 2024)
84 K Acid IS 11557
85 H Acid IS 8637
86 Textiles – Flat Woven Webbing Slings Made of Man-Made Fibres for General Services IS 15041
87 Storage Water Tank for All Glass Evacuated Tubes Solar Water Heating Systems IS 16542
88 All Glass Evacuated Tubes Solar Water Heating System IS 16544
89 Solar Flat Plate Collector for Solar Water Heating Systems IS 12933 Part-2
90 Solar Flat Plate Collector for Solar Water Heating Systems IS 12933 Part 1
91 Fibre Ropes Polyethylene : 3- And 4-Strand Ropes IS 8674
92 Fibre Ropes: Polypropylene Split Film, Monofilament And Multifilament ( PP2 ) and Polypropylene High-Tenacity Multifilament ( PP3 ) -3-, 4-, 8- and 12- Strand Ropes IS 5175:2022
93 Fibre Ropes Of Polyester / Polyolefin dual Fibres IS 17609
94 Fibre Ropes Polyamide 3-, 4-, 8- and 12- Strand Ropes IS 4572:2022
95 Steel Wire Ropes - Fibre Main Cores: IS 1804
96 Stationary Storage Type Electric Water Heaters- IS 2082
97 Mixed Polyolefin Fibre Ropes IS 14929
98 Textiles Composite Synthetic Fibre Ropes Specification IS 14928
99 Fibre Ropes Polyester - 3-, 4-, 8- and 12-strand ropes IS 11066
100 Textiles Manila Ropes Specification IS 1084
101 Vinyl Sulphone: Specification IS 18340
102 Specification for Combination Side Cutting Pliers IS 3650
103 Pipe Wrenches Heavy Duty IS 4003 Part 2
104 Pipe Wrenches of General Purpose IS 4003 Part 1
105 Ring Wrenches IS 2029
106 2 - Naphthylamine - 3: 6: 8 - Tri Sulphonic Acid IS 11557
107 Wear Abrasion Resistant Steel and Plates IS 18809
108 Open-Jaw Wrenches (Spanners) IS 2028
109 Single-ended Open-jaw Adjustable Wrenches IS 6149
110 Ring Slugging Wrenches (Spanners) IS 4509
111 Open-Ended Slugging Wrenches (Spanners) IS 4508
112 Chain Pipe Wrenches IS 4123:1982
113 Carbon and Low Alloy Steel Billets, Blooms, Slabs and Bars Shell Bodies and Proof Shots IS 14698
114 Hot - Rolled Mild Steel Sheet and Strip in Coil Form IS 2385
115 Steel Ingots, blooms, and billets for production of mild steel wire for production of mild steel wire rods for general engineering purposes – Specification IS 8952: 1995
116 Specification for Cold rolled medium, high carbon and low alloy steel strip for general engineering purposes IS 7226: 1974
117 Cold Rolled Non-Oriented Electrical Steel Sheet and Strip –Semi-Processed Type Specification IS 15391:2003
118 Steel Pipes For Water And Sewage IS 3589
119 Hollow Steel Sections For Structural Use IS 4923
120 Steel Tubes For Mechanical And General Engineering Purposes IS 3601
121 Steel Tubes For IDLERS For Belt Conveyors IS 9295
122 Three-Piece Round Open-Top Metal Cans for Food s and Beverages IS 18427
123 Steel Tubes, Tubular, and Other Steel IS 1239 Part-2
124 Hot Rolled And Cold Rolled Steel Strips Intended For Processing Of Semi/ Fully Processed Non-Grain Oriented Electrical Steel Or Fully Processed Grain Oriented Electrical Steel IS 18316: 2023
125 Hot-Dip Zinc-Aluminium-Magnesium Alloy-Coated Steel Sheets, Plates, And Strips IS 18513: 2023
126 Hot-Dip Galvanized/ Galvannealed Steel Sheet And Strips For Automotive Applications IS 18385: 2023
127 Hot Rolled Steel Strip, Sheet, and Plates for Welded Steel Pipe for Pipeline Transportation Systems IS 18384: 2023
128 Electrical Appliances For Stationary Storage Type Electric Water Heaters IS 302
129 Electric Immersion Water Heaters- IS 368
130 Telescopic Ball Bearing Drawer Slide IS 17954:2023
131 Endless V-Belts for Industrial Purposes-Fire Resistant and Antistatic V-Belts IS 2494 Part-2
132 Endless V-Belts for Industrial Purposes-General Purposes IS 2494 Part-1
133 Transmission Devices-V-Belts Endless Narrow V-Belts for Industrial Use IS 14261
134 Ferrovanadium IS 1466
135 Ferromolybdenum IS 1469
136 Malleable Iron Castings IS 14329
137 Pig Iron IS 13502
138 Ductile or Sg Iron Castings IS 1865
139 GLASS FIBRE REINFORCED GYPSUM PANELS IS 17400
140 Reinforced Gypsum Plaster Boards IS 2095 Part-3
141 Coated and Laminated Gypsum Plaster Boards IS 2095 Part-2
142 Plain Gypsum Plaster Boards IS 2095 Part-1
143 Asbestos Cement Building Boards IS 2098
144 Asbestos Cement Flat Sheets IS 2096
145 Asbestos Cement Pressure Pipes and Joints IS 1592
146 Fibre Cement Flat Sheets IS 14862
147 Corrugated and Semi Corrugated Asbestos Cement Sheets IS 459
148 Diesel Engines - Nox Reduction Agent Aus 32 IS 17042 Part-1
149 Heat Treated Steels Alloy and Free Cutting Steels for Ball and Roller Bearing Steels IS 17111
150 Hot Dip Zinc Coating on Structural Steel Bars for Concrete Reinforcement IS 12594
151 Galvanized Structural Steel IS 16732
152 Poly-Laminated Aluminium Cable Wrap IS 16012
153 Switch Socket Outlets (Non-Interlock Type) IS 15787
154 Insulation Mats for Electrical Purposes IS 15652
155 Live Working Gloves of Insulating Material IS 13774
156 CABLE TRUNKING AND DUCTING SYSTEMS FOR ELECTRICAL INSTALLATIONS IS 14927 (Part-2)
157 Boxes and Enclosures for Accessories for Household and Similar Fixed Electrical Installations IS 14772
158 BAYONET LAMP HOLDERS IS 1258
159 Glass Beakers IS 2619
160 NARROW-NECKED BOILING FLASKS IS 1381 (Part-1)
161 SINGLE VOLUME PIPETTES IS 1117
162 One Mark Volumetric Flasks IS 915
163 Graduated Measuring Cylinders IS 878
164 Rubber Gaskets for Pressure Cookers IS 7466
165 Cycle Rubber Tubes IS 2415
166 Cycle and Rickshaw Tyres IS 2414
167 Cabinet Hinges IS 18297
168 Steel Back Flap Hinges IS 3843
169 Double Acting Spring Hinges IS 453
170 HDPE / PP LAMINATED WOVEN SACKS FOR MAIL SORTING, STORAGE, TRANSPORTATION AND DISTRIBUTION IS 17399
171 HDPE / PP WOVEN LAMINATED BLOCK BOTTOM VALVE SACKS FOR PACKAGING OF CEMENT IS 16709
172 HDPE/ PP Woven Sacks for Packaging of Polymer Materials IS 16703
173 HDPE / PP Woven Sacks for Packaging of Cement, IS 11652
174 HDPE / PP Woven Sacks for Packaging of Fertilizers IS 9755
175 Braided Nylon Rope for Mountaineering Purposes IS 6590
176 Wire Ropes Used in Oil Wells and Oil Well Drilling IS 4521
177 STEEL WIRE SUSPENSION ROPES FOR LIFTS, ELEVATORS AND HOISTS IS 2365
178 Steel Wire Ropes for General Engineering Purposes IS 2266
179 HOT DIP GALVANIZED STAY STRAND IS 2141
180 STEEL WIRE ROPES FOR HAULAGE PURPOSES IS 1856
181 Stranded Steel Wire Ropes for Winding and Man-Riding Haulages in Mines IS 1855
182 Galvanized Steel Barbed Wire for Fencing IS 278
183 Non-Metal Helmet for Police Force IS 9562
184 Industry Safety Helmets IS 2925
185 NON-METAL HELMET FOR FIREMEN AND CIVIL DEFENCE IS 2745
186 Door Closers Concealed Type IS 14912
187 Door Handles for Mortice Locks IS 4992
188 DOOR CLOSERS PNEUMATICALLY REGULATED IS 6343
189 Floor Springs for Heavy Doors IS 6315
190 Hydraulically Regulated Door Closers IS 3564
191 RIM LATCHES IS 1019
192 DOOR HANDLES IS 208
193 DRUMS IS 13997
194 Drums Grade A IS 1783 Part 1
195 Drums Grade B IS 1783 Part 2
196 GALVANIZED AND UNGALVANIZED STEEL DRUMS IS 2552
197 SQUARE TINS FOR SOLID PRODUCTS IS 916
198 Bitumen Drums IS 3575
199 SQUARE TINS IS 10325
200 Copper Wire Rods for Electrical Applications IS 12444
201 Copper Rods and Bars for Electrical Purposes IS 613
202 Copper Strip for Electrical Purposes IS 1897
203 Copper Rods and Bars for General Engineering Purposes IS 4171
204 SOLID DRAWN COPPER AND COPPER ALLOY TUBES FOR CONDENSER AND HEAT EXCHANGERS IS 1545
205 Solid Drawn Copper Tubes for General Engineering Purposes IS 2501
206 Copper Tubes for Plumbing IS 14810
207 Wrought Copper Tubes for Refrigeration and Air Conditioning IS 10773
208 Copper Wires for General Engineering Purposes IS 4412
209 Reusable Sanitary Pad / Sanitary Napkin / Period Panties IS 17514
210 Disposable Baby Diaper IS 17509
211 Shoe Covers IS 17349
212 Bedsheet and Pillow Cover IS 17630
213 Dental Bib / Napkins IS 17354
214 Sanitary Napkin IS 5405
215 Silicomanganese IS 1470
216 FERROMANGANESE IS 1171
217 ferrochromium IS 1170
218 Aluminium Alloy Forging Stock and Forgings for Aerospace Applications IS 7902
219 Aluminum Alloy Extruded Tubes for Irrigation Purposes IS 7092 Part 2
220 EC Grade Aluminium Rod Produced by Continuous IS 5484
221 Wrought Aluminium and Aluminium Alloy Bars, Rods, Tubes, Sections, Plates and Sheets for Electrical Applications IS 5082
222 Wrought Aluminium Wire for Electrical Purposes IS 2067
223 Wrought Aluminium and Aluminium Alloys-Extruded Round Tube and Hollow Sections for General Engineering Purposes IS 1285
224 Corrugated Aluminum Sheet IS 1254
225 Wrought Aluminum and Aluminum Alloy Rivet Stock for General Engineering Purposes IS 740
226 Wrought Aluminum and Aluminum Alloys Wire for General Engineering Purposes IS 739
227 WROUGHT ALUMINIUM AND ALUMINIUM ALLOY PLATE FOR GENERAL ENGINEERING PURPOSES IS 736
228 Wrought Aluminium and Aluminium Alloy Bars, Rods and Sections for General Engineering Purposes IS 733
229 Aluminium Composite Panel IS 17682
230 Aluminium Foil for Pharmaceutical Packaging IS 16011
231 Aluminum Alloy Welded Tubes for Irrigation Purposes IS 7092 Part 1
232 Wrought Aluminium and Aluminium Alloy Sheet and Strip for General Engineering Purposes IS 737
233 Wrought Aluminum and Aluminum Alloy Forging Stock and Forgings IS 734
234 Wrought Aluminium and Aluminium Alloys for Manufacture of Utensils IS 21
235 SELF CONTAINED DRINKING WATER COOLERS IS 1475 Part 1
236 Short-Pitch Transmission Precision Roller and Bush Chains, Attachments and Associated Chain Sprockets IS 2403
237 High Strength Deformed Stainless Steel Bars and Wires for Concrete Reinforcement IS 16651
238 Bar or Wire Wrapped Steel Cylinder Pipes with Mortar Lining and Coating or Specials IS 15155
239 Stainless Steel Tubes for the Food and Beverage Industry IS 6913
240 STEEL PIPE FLANGES IS 6392
241 Non-Ferrous Metal Butt Hinges IS 205
242 Stainless Steel Butt Hinges IS 12817
243 Continuous Piano Hinges IS 3818
244 Steel Butt Hinges IS 1341
245 Parliament Hinges IS 362
246 Tee and Strap Hinges IS 206
247 FLUX CORED SOLDER WIRE IS 1921
248 Structural Plywood IS 10701
249 Fire Retardant Plywood IS 5509
250 Plywood for Concrete Shuttering Works IS 4990
251 Wooden Flush Door Shutters Solid Core Type IS 2202 Part-2
252 Wooden Flush Door Shutters (Solid Core Type) - Plywood Face Panels IS 2202 Part-1
253 BIS certification for Wooden Flush Door Shutters IS 2191 Part-2
254 Wooden Flush Door Shutters (Cellular, Hollow and Tubular Core Type) -Plywood Face Panels IS 2191 Part-1
255 Veneered Decorative Plywood IS 1328
256 Marine Plywood IS 710
257 Plywood for General Purposes IS 303
258 Stainless Steel Seamless Pipes and Tubes for General Services IS 17875
259 Stainless Steel Welded Pipes and Tubes for General Service IS 17876
260 CPVC FITTINGS FOR HOT AND COLD WATER SUPPLIES IS 17546
261 Tile Adhesive IS 15477
262 NON-PRESSURE UPVC PIPES FOR DRAINAGE AND SEWERAGE IS 15328
263 UPVC PIPES FOR SOIL AND WASTE DISCHARGE IS 13592
264 Pvc Water Storage Tank IS 12701
265 UPVC Drainage Pipes IS 9271
266 UPVC Pipes for Potable Water Supply IS 4985
267 HDPE Pipes for Potable Water Supply IS 4984
268 AAC BLOCK IS 2185 Part 3
269 Wall Putty IS 17545
270 CPVC PIPES FOR POTABLE HOT AND COLD WATER SUPPLIES IS 15778
271 UPVC Screen and Casing Pipes for Bore and Tubewells IS 12818
272 PVC Conduit Pipe IS 9537 Part 3
273 Concrete Admixtures IS 9103
274 Integral Waterproofing Compound IS 2645
275 Thermosetting Insulated, Fire Survival Cables IS 17505 Part-1
276 ELECTRIC CABLES FOR PHOTOVOLTAIC SYSTEMS FOR RATED VOLTAGE 1500 V IS 17293
277 High purity primary aluminum ingot for remelting for special applications IS 11890
278 NICKEL POWDER IS 7506
279 Cast Alloy or Wrought Alloy Aluminium Ingots for Remelting for General Engineering Purpose IS 6754
280 Aluminum Ingots Billets and Wire Bars IS 4026
281 Primary Aluminum Ingots for remelting IS 2590
282 Cast Aluminum and its Alloys - Ingots and Castings for General Engineering Purposes IS 617
283 COPPER IS 191
284 Polyvinyl Chloride (PVC) Homopolymers IS 17658
285 Polypropylene (PP) Materials for Moulding and Extrusion IS 10951
286 ELECTRIC CEILING FANS IS 374
287 CAST IRON SINGLE FACED THIMBLE MOUNTED SLUICE GATES IS 13349
288 Malleable Cast Iron Pipe Fittings IS 1879
289 Cast Iron or Ductile Iron Drainage Pipes and Pipe Fittings IS 1729
290 Cast Iron Manhole Covers and Frames IS 1726
291 Cast Iron Pressure Pipes for Water, Gas and Sewage IS 1537
292 Grey Iron Castings IS 210
293 Pre-Laminated Particle Boards IS 12823
294 Medium Density Fibre Boards for General Purposes IS 12406
295 Veneered Particle Boards IS 3097
296 Particle Boards for General Purposes IS 3087
297 Block Boards IS 1659
298 Wheeled Fire Extinguishers IS 16018
299 Portable Fire Extinguishers IS 15683
300 Domestic Gas Stove for Use with Png IS 17153
301 Stainless Steel Utensils IS 14756
302 Aluminium Cans for Beverages IS 14407
303 Stainless Steel Sinks IS 13983
304 Round Open Top Tinplate Sanitary Cans for Foods and Drinks IS 9396 Part-1
305 Wrought Aluminium Utensils IS 1660
306 Flush Bolts IS 5187
307 Non-Ferrous Sliding Door Bolts (ALDROPS) IS 2681
308 Hexagon Head Screw Grade A and B IS 1364 PART-2
309 Hexagon Nuts IS 1363 Part-3
310 Hexagon Head Screw IS 1363 PART-2
311 Stainless Steel Sliding Door Bolts (ALDROPS) IS 15834
312 Stainless Steel Tower Bolts IS 15833
313 Threaded Steel Fasteners-Hexagon Head Transmission Tower Bolts IS 12427
314 Threaded Steel Fasteners IS 10238
315 Sliding Locking Bolts for Use with Padlocks IS 7534
316 High Strength Structural Nuts IS 6623
317 Indicating Bolts for Use in Public Baths and Lavatories IS 4621
318 High Strength Structural Bolts IS 3757
319 Hexagon Head Bolts Grade A AND B IS 1364 Part-1
320 HEXAGON HEAD BOLTS IS 1363 Part-1
321 Wrought Aluminum Alloy Bolt and Screw Stock IS 1284
322 Mild Steel Sliding Door Bolts for Use with Padlocks IS 281
323 Tower Bolts-Non-Ferrous Metal IS 204 Part 2
324 Tower Bolts-Ferrous Metals IS 204 Part 1
325 Resin Treated Compressed Wood Laminates Compregs for General Purpose IS 3513 Part 3
326 Resin Treated Compressed Wood Laminates Compregs for Chemical Purpose IS 3513 Part 2
327 Resin treated compressed wood laminates compregs for electrical purpose IS 3513 Part 1
328 Insulated Flask for Domestic Use IS 17790
329 Insulated Containers for Food Storage IS 17569
330 Domestic Stainless Steel Vacuum Flask or Bottle IS 17526
331 Potable Copper Stainless Aluminium Water Bottles IS 17803
332 Utility Lighters IS 22702
333 Lighters IS 9994:2018
334 Protective Clothing for Welding IS 16655
335 High Visibility Warning Clothes - Specification IS 15809
336 Textiles - Requirements for Clothing Made of Limited Flame Spread Materials and Material Assemblies Affording Protection Against Heat and Flame IS 15742
337 Textiles - Protective Clothing for Industrial Workers Exposed to Heat (Excluding Firefighters’ and Welders’ Clothing) IS 15748
338 TEXTILES - Protective Clothing for Firefighters – Specification IS 16890
339 Textiles - Protective Gloves for Firefighters - Specification IS 16874
340 TEXTILES - Resistance to Ignition of Upholstered Composites Used for Non- Domestic Furniture IS 15768
341 TEXTILES - Tactical 3 Point Sling Universal - Specification IS 16725
342 Textiles - Water-Proof Multipurpose Rain Poncho with Convertibility as Bivouac IS 17286
343 TEXTILES – RESISTANCE TO IGNITION OF CURTAINS AND DRAPES IS 15741 : 2007
344 TEXTILES - POUCH FOR AMMUNITION AND GRENADES MADE OF DISRUPTIVE PATTERN NYLON 66 - SPECIFICATION IS 16726
345 TEXTILES - Bullet Resistant Jackets - Performance Requirements IS 17051
346 Geosynthetics-Geocells Slope Erosion Protection Application IS 17374 (PART-2)
347 Geosynthetics-Geocells Load Bearing Application IS 17483 (Part-1)
348 Geosynthetics Reinforced Hdpe Membrane for Effluents and Chemical Resistance Lining IS 17374
349 Geosynthetics Retaining Structures Geogrids Used in Reinforced Soil Retaining Structures IS 17373
350 Polymeric Strip or Geostrip Used as Soil Reinforcement in Retaining Structures IS 17372
351 Geogrids for Flexible Pavements IS 17371
352 Geotextiles for Permanent Erosion Control in Hard Armor Systems IS 16392
353 Geosynthetics Geotextiles (Or Cushioning) Materials-Textiles Used as Protection IS 16090
354 Geosynthetics - High Density Polyethylene (Hdpe) Geomembranes for Lining IS 16352
355 Geosynthetics - Geotextiles Used in Subgrade Stabilization in Pavement Structures IS 16362
356 Geotextiles Used in Subsurface Drainage Application IS 16393
357 Geotextiles Used in Sub-Grade Separation in Pavement Structures IS 16391
358 Open Weave Coir Bhoovastra IS 15869
359 Jute Geotextiles (Part-2) Control of Bank Erosion IS 14715 (PART-2)
360 Jute Geotextiles Strengthening of Sub-Grade in Roads IS 14715 (PART-1)
361 Polypropylene Multifilament Woven Geobags for Coastal and Waterways Protection IS 16654
362 Needle Punched Non-Woven Geobags IS 16653
363 Polyvinyl Chloride (PVC) Geomembranes for Lining IS 15909
364 Laminated High Density Polyethylene (Hdpe) Woven Geomembrane for Water Proof Lining IS-15351
365 Household Zig-Zag Sewing Machine Head IS 15449 PART 1
366 Flux Cored (Tubular) Electrodes for Gas Shielded and Self-Shielded Metal Welding of Carbon or Carbon- Manganese Steel IS 15769
367 Hubless Centrifugally Cast (Spun) Iron Pipes, Fittings and Accessories – Spigot Series IS 15905:2011
368 Centrifugally Cast (Spun) Iron Spigot and Socket Soil, Waste, Ventilating and Rainwater Pipes, Fittings and Accessories IS 3989
369 Centrifugally Cast (Spun) Iron Pressure Pipes for Water, Gas and Sewage IS 1536
370 Deep Freezers IS 7872
371 Household Refrigerating Appliances- Characteristics and Test Methods Part-1 General Requirements IS 17550 PART 1
372 Helmet for riders of Two-Wheeler Motor Vehicles IS 4151
373 Tools for Pressing Part 3 Round Punches with 60 Degree Conical Head and Reduced Shank IS 4296 PART 3
374 Tools for Pressing-Punches with Cylindrical Head and Straight or Reduced Shank IS 4296 PART 2
375 Tools for Pressing Part 1 Round Punches with 60 Degrees Conical Head and Straight Shank IS 4296 PART 1
376 Personal Protective Equipment Occupational Footwear IS 15298 PART 4 : 2017
377 Personal Protective Equipment Safety Footwear IS 15298 PART 3
378 Personal Protective Equipment Safety Footwear IS 15298 PART 2
379 Derby Shoes IS 17043
380 Antiriot Shoes IS 17037
381 High Ankle Tactical Boots with Pu – Rubber Sole IS 17012
382 Sports Footwear IS 15844
383 Leather Safety Footwear with Direct Moulded Polyvinyl Chloride (PVC) Sole IS 14544
384 Leather Safety Footwear Having Direct Moulded Rubber Sole IS 11226
385 Safety Rubber Canvas Boots for Miners IS 3976
386 Canvas Boots Rubber Sole IS 3736
387 Canvas Shoes Rubber Sole IS 3735
388 Leather Safety Boots and Shoes for Heavy Metal Industries IS 1989 PART 2
389 Leather Safety Boots and Shoes for Miners IS 1989 PART 1
390 Footwear for Men and Women for Municipal Scavenging Work IS 16994
391 Moulded Plastics Footwear (Industrial Pu Boots) IS 16645
392 Unlined Moulded Rubber Boots IS 13995
393 Polyurethane Sole, SEMIRIGID IS 13893
394 Polyvinyl Chloride (PVC) Industrial Boots IS 12254
395 Slippers, Rubber IS 11544
396 Rubber Hawai Chappal IS 10702
397 PVC Sandal IS 6721
398 SOLID PVC SOLES AND HEELS IS 6719
399 Rubber Microcellular Sheets for Soles and Heels IS 6664
400 Moulded Solid Rubber Soles and Heels IS 5676
401 All Rubber Gum Boots and Ankle Boot IS 5557 PART 2
402 Industrial and Protective Rubber Knee and Ankle Boots IS 5557
403 Wheel Rims for Trucks & Buses (TRUCKS & BUSES WHEEL RIMS) IS 9438
404 Wheels of Passenger Cars, Quadricycles and Mini Goods Carriers IS 9436
405 Wheel Rims for Two and Three Wheeled Vehicles Spoke Wheel Rims IS 16192 PART 3
406 Sheet Metal Wheel Rims for Two Wheeler or Three Wheeler Vehicles IS 16192 PART 2
407 Light Alloy Wheel Rims for Two Wheeler or Three Wheeler Vehicles IS 16192 PART 1
408 Cattle Feeds IS 2052
409 Plain Copier Paper IS 14490:2018
410 Retro-Reflective Devices IS 6742
411 Butterfly Valves for General Purpose IS 13095
412 Hdpe/ PP Woven Sacks for Sand IS 14252
413 HDPE/ PP woven sacks for packaging sugar (50kg / 25kg) IS 14968
414 HDPE/ PP Woven Sacks for Packaging Food Grains (10KG / 15KG / 20KG / 25KG / 30KG) IS 16208
415 HDPE/PP Woven Sacks for Packaging Food Grains (50KG) IS 14887
416 Safety Glass for Road Transport IS 2553 PART 2
417 Safety Glass for Architectural, Building and General Uses IS 2553 PART 1
418 Flat Transparent Sheet Glass IS 2835
419 Sulphate Resisting Portland Cement IS 12330
420 Non Electric Toys and Electric Toys IS 9873 PART1 (2,3,4,7,9) & IS 15644
421 Aluminium and Aluminium Alloy Bare Foil for Food Packaging IS 15392
422 Rubber Hose for Liquefied Petroleum Gas (Lpg)- Specification Part 2- Domestic and Commercial Application IS 9573 PART 2
423 Rubber Hose for Liquefied Petroleum Gas LPG IS 9573 Part-1
424 Halogen Free Flame Retardant (HFFR) Cables for Working Voltages Up to and Including 1100 V IS 17048
425 Shot Firing Cables (For Use Other Than in Shafts) IS 5950
426 Flexible Cables for Miner’s Cap-Lamps IS 2593
427 Elastomer Insulated Flexible Cables for Use in Mines IS 14494
428 Welding Cables: IS 9857
429 Thermocouple Compensating Cables IS 8784
430 Elastomer Insulated Cables (3.3-33KV) IS 9968 PART 2
431 Aerial Bunched Cables (Upto 1100v) IS 14255
432 Cross-Linked Polyethylene Insulated Thermoplastics Sheathed Cables (66-220kv) IS 7098 PART 3
433 Crosslinked Polyethylene Insulated Thermoplastics Sheathed Cables (3.3-33kv) IS 7098 PART 2
434 Crosslinked Polyethylene Insulated Pvc Sheathed Cables (Upto 1100v) IS 7098 PART 1
435 Pvc Insulated (Heavy Duty) Electric Cables (3.3-11KV) IS 1554 PART 2
436 Pvc Insulated (Heavy Duty) Electric Cables (UPTO 1100V) IS 1554 Part 1:1988
437 Domestic Pressure Cooker IS 2347
438 Transparent Float Glass IS 14900
439 Domestic Gas Stoves for Use with Liquefied Petroleum Gases IS 4246
440 Plugs and Socket-Outlets (Up to and Including 250v & 16 Amperes) IS 1293:2019
441 Reverse Osmosis (Ro) Based Point-Of-Use (Pou) Water Treatment System IS 12640:2015
442 Jute Bags for Packing Up to 30 Kg Food grains IS 16372:2015
443 Light Weight Jute Sacking Bags for Packing 50 Kg Foodgrains IS 16186:2014
444 Jute Bags for Packing 50 Kg Sugar IS 15138:2010
445 Jute Bags for Packing 50 Kg Foodgrains IS 12650:2018
446 B-Twill Jute Bags for Packing Foodgrains IS 2566:1993
447 Twill Jute Bag IS 1943:1995
448 Ac Direct Connected Static Prepayment Meters for Active Energy (Class1 and Class 2) IS 15884
449 Malleable Iron Shots and Grits for Use in Foundries IS 9139:1979
450 Steel Tubes Used for Water Wells IS 4270
451 Steel Tubes, Tubulars and Other Wrought Fittings (Steel Tubes) IS 1239 Part 1
452 Steel Tubes for Structural Purposes IS 1161
453 Ductile Iron Fittings for Pressure Pipes for Water, Gas and Sewage IS 9523:2000
454 Centrifugally Cast (Spun) Ductile Iron Pressure Pipes for Water, Gas and Sewage IS 8329:2000
455 Electrogalvanized Hot Rolled and Cold Reduced Carbon Steel, Sheet and Strips IS 17404:2020
456 Stress-Relieved Low Relaxation Steel IS 16644:2018
457 Stock for Forgings Produced from Continuously Cast Blooms, Billets and Slabs IS 13352:1992
458 Thermostat Metal Sheet and Strip IS 5478:1969
459 Flame and Induction Hardening Steels IS 3930
460 Cold-Reduced Tinmill Products - Blackplate IS 11951:2016
461 Carbon and Low Alloy Steel Billets, Blooms, Slabs and Bars for Manufacture of Shell Bodies and Proof Shots Used in Defence Services IS 14986:1999
462 Finned Type Heat Exchanger for Room Air Conditioner IS 11329:2018
463 Tool Steel Forgings for Metal Forming IS 13387:1992
464 Quenched and Tempered Alloy Steel Forgings for Pressure Vessels IS 12145:1987
465 Ducted and Package Air Conditioners IS 8148:2018
466 Forged / Rolled Ctc Segments IS 8748:1978
467 Steels for Die Blocks for Drop Forging IS 5518:1996
468 Room Air Conditioners- Specification Part 2 Split Air Conditioners IS 1391 Part 2
469 Case Hardening Steels IS 4432:1988
470 Room Air Conditioners (UNITARY AIR CONDITIONERS) IS 1391 Part 1
471 Carbon and Carbon Manganese Free Cutting Steels IS 4431:1978
472 Instantaneous Domestic Water Heater for Use with Liquefied Petroleum Gas IS 1555
473 Mould Steels IS 4430:1979
474 Domestic Electric Food Mixer (Liquidizers and Grinders) and Centrifugal Juicer IS 4250:1980
475 Structural Steel IS 15911:2010
476 Hot-Dip Terne Coated Carbon Steel Sheets IS 12313:1988
477 Hand-Held Blender IS 302 PART 2 SECTION 14
478 Trapezoidal Steel Wires for Spring Washers IS 12262:1988
479 Hydrogenated Rice Bran Fatty Acids IS 12361
480 Mild Steel Wire for Cottor Pins IS 10794:1984
481 RUBBERSEED Fatty Acids IS 12124
482 Coconut Fatty Acids IS 12069
483 Cold-Reduced and Hot-Rolled Carbon Steel Sheet for Porcelain Enamelling IS 9485:1980
484 Rice Bran Fatty Acids IS 12068
485 Palm Fatty Acids IS 12067
486 Hot Rolled Steel Plates, Sheets and Strips for Manufacture of Agricultural Tillage Discs IS 9442:1980
487 Acid Oil IS 12029:1986
488 Steel Plates for Galvanizing Pots IS 8917:1978
489 Lauric Acid IS 10931:1984
490 Steel Wire for Reeds IS 8566:1977
491 Heald Wire IS 8565:1977
492 1,3 Phenylenediamine IS 17450:2020
493 Vinyl Chloride Monomer IS 17442
494 Steel Wire for Nipples for Spokes IS 8564:1977
495 Polyurethanes IS 17397 PART-1
496 Half Round Mild Steel Wire for the Manufacture of Split Pins IS 8563:1977
497 Polycarbonate Moulding and Extrusion Materials IS 14434:1998
498 Tinned Steel Wire for Banding of Armatures and Rotors IS 8510 PART 3
499 Tinned Steel Wire for Banding of Armatures and Rotors IS 8510 PART 2
500 P-Xylene IS 17370
501 Steel for Spring Washers IS 4072:1975
502 Ethylene Dichloride IS 869
503 Mild Steel Rivet Bars for Shipbuilding IS 3298:1981
504 Acrylonitrile Butadiene Styrene (ABS) IS 17077:2022
505 Red Phosphorus IS 2012:2006
506 Hard Drawn Steel Wire for Upholstery Springs IS 2589:1975
507 Steel Billets, Bars and Sections for Boilers IS 2100:1970
508 Methylene Chloride (Dichloromethane) IS 4566:2020
509 Expanded Metal Steel Sheets for General Purposes IS 412:1975
510 3(n, N-Diethyl) Aminophenol IS 7686:2020
511 Cold-Reduced Tinmill Products IS 12591:2018
512 Cold-Reduced Tinmill Products - Electrolytic Tin Plate IS 1993:2018
513 Steel Wire for Mechanical Springs (Stainless Steel Wire) IS 4454 Part 4
514 Chrome Molybdenum Steel Bars and Rods for Aircraft Purposes IS 963:1958
515 Soft Magnetic Iron Rods, Bars, Flats and Sections IS 11947:1987
516 Soft Magnetic Iron Strips IS 11946:1987
517 Carburizing Steel for Use in Bearing Industry IS 5489
518 Hard-Drawn Wire Fabric for Concrete IS 1566:1999
519 Ethylene Vinyl Acetate (Eva) Copolymers IS 13601:1999
520 18% Nickel Maraging Steel Bars and Rods IS 14652:1999
521 Alloys Used in Electrical Resistance Metallic Heating Elements IS 12045:1987
522 Steels for Piston Pins (Gudgeon Pins) IS 11952:1986
523 Heat Resistance Steels IS 9516:1980
524 Steels for Pneumatic Tools IS 5651:1987
525 Steel for Cold Heading/cold Extrusion Applications IS 11169 PART 2
526 Non Magnetic Stainless Steels for Electrical Applications IS 10632 PART 3
527 Non Magnetic Stainless Steels for Electrical Applications IS 10632 PART 2
528 Stainless Steel for Welding Electrode Core IS 10631
529 Cold–rolled stainless steel strips for razor blades IS 9294:1979
530 Linear Alkyl Benzene IS 12795
531 Synthetic Micro-Fibres for Use in Cement Based Matrix IS 16481:2022
532 Styrene-Butadiene Rubber Latex IS 11356:2020
533 Stainless Steel Blooms, Billets and Slabs for Forgings IS 6529:1996
534 Polyethylene Material for Moulding and Extrusion – LDPE, LLDPE, HDPE polyethylene Material for Moulding and Extrusion – LDPE, LLDPE, HDPE IS 7328:2020
535 High Tensile Steel Bars Used in Prestressed Concrete IS 2090:1983
536 Polyester Staple Fibres (PSF) IS 17263:2022
537 Low Carbon Steel Wire for Rivets for Use in Bearing Industry IS 4882:1979
538 Polyester Partially Oriented Yarn (POY) IS 17262:2022
539 Carbon Steel Cast Billet Ingots Billets, Blooms and Slabs for Re-Rolling Purposes IS 14650:1999
540 Polyester Industrial Yarn (IDY) IS 17264:2022
541 Polyester Continuous Filament Fully Drawn Yarn (FDY) IS 17261
542 Low Carbon High Strenth Cold Rolled Steel Sheets and Coilsfor Cold Forming IS 14491
543 100 Percent Polyester Spun Grey and White Yarn (PSY) IS 17625:2022
544 Steel for High Temperature Bolting Application IS 14331:1995
545 Acrylonitrile IS 12540
546 Maleic Anhydride, Technical IS 5149
547 Styrene (Vinyl Benzene) IS 4105:2020
548 Vinyl Acetate Monomer IS 12345:1988
549 Ethyl Acrylate IS 14708:1999
550 Methyl Acrylate IS 14707:1999
551 Terephthalic Acid IS 15030:2001
552 Toluene IS 537:2011
553 Ethylene Glycol IS 5295:2021
554 Ether IS 336:2021
555 N- Butyl Acrylate IS 14709:2021
556 Sodium Tripolyphosphate (Stpp), Anhydrous, Technical IS 6100:2021
557 Sodium Formaldehyde Sulphoxylate IS 4505:2015
558 Precipitated Barium for Ceramic & Glass Industry IS 12928:1990
559 Precipitated Barium Carbonate, Technical IS 3205:1984
560 Stabilized Hydrogen Peroxide IS 2080:2021
561 Phosphorous Oxychloride Technical IS 11657:2020
562 Phosphorous Pentachloride, Technical IS 11744
563 Phosphorous Trichloride, Pure and Analytical Reagentphosphorous Trichloride, Pure and Analytical Reagent IS 4581:2021
564 Acetone IS 170:2020
565 Potassium Carbonate, Anhydrous IS 7129:2021
566 Sodium Sulphide, Technical IS 297:2001
567 Morpholine IS 12084:2013
568 Beta Picoline IS 16112:2013
569 Gamma Picoline IS 16113:2013
570 Pyridine IS 8058:2018
571 Phthalic Anhydride, Technical IS 5158:1987
572 Methanol (Methyl Alcohol) IS 517:2020
573 Aniline IS 2833:2019
574 Acetic Acid IS 695:2020
575 Poly Aluminium Chloride IS 15573:2018
576 Boric Acid – Specification IS 10116:2015
577 Caustic Soda Specification IS 252:2013
578 Shunt Power Capacitors of the Non-Self-Healing Type for AC system IS 13585 (PART 1)
579 Power Capacitors of Self-Healing Type for Ac Power Systems Having Rated Voltage Up To 1000V IS 13340 PART 1
580 A.C. Motor Capacitors IS 2993:1998
581 Line Operated Three Phase A.c. Motors (Ie Code) “Efficiency Classes and Performance Specification” IS 12625:2018
582 Outdoor Type Oil Immersed Distribution Transformers (2500KVA, 33KV) IS 1180 (Part 1)
583 Cold Rolled Carbon Steel /Coils for Manufacture of Welded Tubes IS 12367:1988
584 Steel Wire for Needles IS 9962:1981
585 Cold Rolled Steel Strips for Carbon Steel Razor Blades IS 9476:1980
586 Steel Cast Billet Ingots, Billets, and Blooms for Production of High Carbon Steel Wire Rods IS 8951:2001
587 Steel Ingots Billets and Blooms for the Production of Springs Rivets and Screws for General Engineering Application IS 8052:2006
588 Steel Wire : Uartto 20 Mm for the Manufacture of Cold Forged Rivets IS 7557:1982
589 Steel for Electrically Welded Round Link Chains IS 6967:1973
590 Steel Wire for Spokes IS 6902
591 Carbon-Chromium for the Manufacturer of Balls, Rollers and Bearing Races IS 4398:1994
592 Cold Rolled Carbon Steel Strips for Ball and Roller Bearing Cages/ Retainer IS 4397:1999
593 Steel Wire for Staples, Pins and Clips IS 4224:1972
594 Steel Wire for Umberlla Ribs IS 4223:1975
595 Steel for the Manufacturer of Laminated Springs IS 3885 PART 2 : 1992
596 Steel for the Manufacturer of Laminated Springs IS 3885 PART 1 : 1992
597 Steel for the Manufacture of Volute, Helical and Laminated Springs for Automotive Suspension IS 3431:1982
598 Steel for the Manufacture of Volute and Helical Springs (For Railway Rolling Stock) IS 3195:1992
599 Mild Steel Wire Rod for the Manufacture of Machine Screws (By Cold Heading Process) IS 2255:1977
600 Cold – Rolled Steel Strips for Springs IS 2507:1975
601 Carbon Steel Wire for the Manufacture of Wood Screws IS 1812:1982
602 Mild Steel Wire, Cold Heading Quality IS 1673:1984
603 Steel Rivet Bars (Medium and High Tensile) – for Structural Purposes IS 1148:2009
604 Carbon Steel Cast Billet Ingots, Billets, Blooms and Slabs for Re-Rolling into Structural Steel (Ordinary Quality) IS 2831:2012
605 Magnetic Materials IS 16585:2016
606 Carbon Manganese Steel Forgings for Pressure Vessels IS 12146:1987
607 Steel for Valves for Internal Combustion Engines IS 7494:1981
608 High Speed Tool Steels IS 7291:1981
609 Steel for Hardening and Tempering IS 5517
610 Tool and Die Steels IS 3748:2022
611 Bright Steel Bars IS 9550:2001
612 Structural Steel for Construction of Hulls of Ships IS 3039:1988
613 Hot-Rolled Mild Steel Sheet and Strip in Coil Form for Cold-Reduced Tinplate and Cold-Reduced Black Plate IS 2835:1977
614 Hot Rolled Steel Strip (Bailing) IS 1029
615 Ferronickel IS 4409:1973
616 Ferrosilicon IS 1110
617 Low Nickel Austenitic Stainless Steel Sheet and Strip for Utensils and Kitchen Applications- Specification IS 15997:2012
618 Stainless Steel Plate, Sheet and Strip IS 6911:2017
619 Stainless Steel Sheets and Strips for Utensils- Specification IS 5522:2014
620 Stainless Steel Bars and Flats IS 6603:2001
621 Stainless Steel Wires IS 6528:1995
622 Stainless Steel Wire Rod IS 6527:1995
623 Structural Steel for Building for Structures with Improved Seismic Resistance IS 15962:2012
624 Hot Dip Aluminium- Zinc Alloy Metallic Coated Steel Strip and Sheet (Plain) IS 15961:2012
625 High Tensile Strength Flat Rolled Steel Plate (Up to 6 Mm) Sheet and Strip for the Manufacture of Welded Gas Cylinder IS 15914:2011
626 Fire Resistant Steel – Specification IS 15103:2002
627 Structural Weather Resistant Steel IS 11857:1986
628 Steels for Cold Heading/cold Extrusion Application Part-1 Wrought Carbon and Low Alloy Steels IS 11169 Part 1
629 Bead Wires for Tyres IS 4824:2006
630 Steel Wire for Mechanical Springs Part-2 Oil Hardened and Tempered Steel Wire IS 4454 Part 2
631 Steel Wire for Mechanical Springs Part-1 Cold Drawn Unalloyed Steel Wire IS 4454 Part 1
632 Alloy Steel Billets, Blooms and Slabs for Forging for General Engineering Purposes IS 4368:1967
633 Low Carbon Galvanized Steel Wires Formed Wires and Tapes for Armouring of Cables IS 3975:1999
634 Round Steel Wire for Ropes IS 1835:1976
635 Mild Steel Wire for General Engineering Purposes IS 280:2006
636 Pre-Painted Aluminium Zinc Alloy Metallic Coated Steel Strip and Sheet (Plain) IS 15965:2012
637 Pre-Painted Galvanized Steel Sheets and Coils IS 14246:2013
638 High Carbon Steel Wire Rods- Specification IS 7904:2018
639 Hot Rolled Steel Narrow Width Strip for Welded Tubes and Pipes IS 15647:2006
640 Hot Rolled Carbon Steel Strip for Cold Rolling Purposes IS 11513:2017
641 Hot Rolled Steel Strip for Welded Tubes and Pipes IS 10748:2004
642 Mild Steel Wire Rods for General Engineering Purposes IS 7887:1992
643 Hot Rolled Bars for Production of Bright Bars and Machined Parts for Engineering Applications IS 7283:1992
644 Hot Rolled Steel Plate (Up to 6 Mm) Sheet and Strip for the Manufacture of Low Pressure Liquefiable Gas Cylinders IS 6240
645 Hot Rolled Steel Sheet, Plate and Strip for Forming and Flanging Purposes — Specification IS 5986:2017
646 Cold Rolled Steel Strips (Box Strappings) IS 5872:1990
647 Steel Chequered Plates IS 3502:2009
648 Mild Steel for Metal Arc Welding Electrodes IS 2879:1998
649 Carbon Steel Billets, Blooms, Slabs and Bars for Forgings IS 1875:1992
650 Hot Rolled Carbon Steel Sheet, Plate and Strip IS 1079 : 2017
651 Cold Reduced Carbon Steel Sheets and Strips IS 513 (PART 2)
652 Cold Reduced Carbon Steel Sheets and Strips Part 1 Cold Forming and Drawing Purpose Is 513 Part 1:2016
653 Mild Steel and Medium Tensile Steel Bars and Hand Drawn Steel Wire for Concrete Reinforcement IS 432 (PART 2)
654 Medium Tensile Steel Bars IS 432 Part 1
655 Hot Rolled Medium and High Tensile Structural Steel IS 2062:2011
656 Oriented Electrical Steel Sheet and Strip- Semi-Processed Type- Specification IS 15931:2003
657 Grain Oriented Electrical Steel Sheet & Strip (Crgo) IS 3024:2015
658 Cold Rolled Non-Oriented Electrical Steel Sheets and Strip-Fully Processed Type (CRNO) IS 648:2022
659 Deformed Steel Bars and Wires for Concrete Reinforcement IS 1786
660 Carbon Steel Cast Billet Ingots, Billets, Blooms and Slabs for Rerolling IS 2830:2012
661 Steel Plates for Pressure Vessels Used at Moderate and Low Temperature IS 2041:2009
662 Steel Plates for Pressure Vessels for Intermediate and High Temperature Service Including Boilers IS 2002:2009
663 Galvanized Steel Strips and Sheets (Plain and Corrugated) IS 277:2003
664 Uncoated Stress Relieved Low Relaxation Seven-Ply Strand for Pre-Stressed Concrete IS 14268:2022
665 Fusion Bonded Epoxy Coated Reinforcing Bars IS 13620:1993
666 Uncoated Stress Relieved Strand for Pre-Stressed Concrete IS 6006:2014
667 Indented Wire for Pre-Stressed Concrete IS 6003:2010
668 Plain Hard-Drawn Steel Wire for Pre-Stressed Concrete Part 2: As Drawn Wire IS 1785 PART 2:1983
669 Cold Drawn Stress-Relieved Wire IS 1785 PART 1:1983
670 Diagnostic Medical X-Ray Equipment IS 7620 PART 1
671 Clinical Thermometers :Part 2 Enclosed Scale Type IS 3055 PART 2 : 2004
672 Clinical Thermometers :Part1 Solid Stem Type IS 3055 PART 1 : 1994
673 Low pressure Regulators IS 9798:2013
674 Valve Fittings for Use with Liquified Petroleum Gas IS 8776
675 Valve Fittings for Use with Liquefied Petroleum Gas Cylinders IS 8737:2017
676 Weilded and Seamless Steel Dissolved Acetylene Gas Cylinders IS 7312:2018
677 Valve Fittings for Gas Cylinder IS 7302:2018
678 Refillable Seamless Steel Gas Cylinders IS 7285 PART 2:2017
679 Refillable Seamless steel gas cylinders IS 7285 Part 1 : 2018
680 Welded Low Carbon Steel Cylinders for Low Pressure Liquefiable Gases IS 7142:1995
681 Yoke Type Valve Connection for Small Medical Gas Cylinders IS 3746:2006
682 Valve Fittings for Compressed Gas Cylinder IS 3224:2021
683 Welded Low Carbon Steel Gas Cylinder IS 3196 PART 2: 2006
684 Welded Low Carbon Steel Gas Cylinder IS 3196 PART 1:2013
685 Welded Low Carbon Steel Gas Cylinder IS 3196 PART 4 : 2011
686 Liquefied Petroleum Gas (Lpg) Containers for Automotive Use IS 15100:2018
687 Liquefied Petroleum Gas Containers for Automotive Use IS 14899:2014
688 Pneumatic Tyres for Commercial Vehicles-Diagonal and Radial Ply IS 15636
689 Pneumatic Tyres for Passenger Car Vehicles– Diagonal and Radial Ply IS 15633:2022
690 Pneumatic Tyres for Two and Three-Wheeled Motor Vehicles IS 15627:2022
691 Automotive Vehicles –Tubes for Pneumatic Tyres IS 13098:2012
692 Oil Pressure Stoves IS 1342:2002
693 Multi-Burner Oil Pressure Stoves IS 2787:2006
694 Oil Pressure Stove, Offset Burner Type IS 10109
695 Glass Feeding Bottles IS 5168:2018
696 Plastic Feeding Bottles IS 14625:2015
697 Milk-Cereal Based Complementary Foods IS 1656
698 Packaged Drinking Water IS 14543
699 Partly Skimmed Milk Powder IS 14252:1998
700 Infant Milk Substitutes IS 14433:2022
701 Packaged Natural Mineral Water IS 13428:2015
702 Skimmed Milk-Powder, Extra Grade IS 13334 PART 2 : 2014
703 Skimmed Milk-Powder IS 13334 PART 1 : 2014
704 SWEETENED ULTRA HIGH TEMPERATURE TREATED CONDENSED MILK IS 12176
705 Skimmed Condensed Milk IS 1166: 2022
706 Whole Milk Powder IS 1165
707 Cereal Based Complementary Foods IS 11536:2022
708 Follow Up Formula – Complimentary Foods IS 15757
709 Dry Batteries IS 8144:2018
710 Elastomer Insulated Cables 1100 V IS 9968 PART 1
711 Electrical Accessories-Circuit Breakers for Overcurrent Protection IS 8828
712 Pvc Insulated Cable 1100v IS 694
713 Electric Lamps (Upto100 W) IS 418
714 Switches for Domestic and Similar Purposes IS 3854:1997
715 Room Heaters IS 302 Part 2 Section 30
716 Electric Stoves IS 302 (Part 2/Sec 202)
717 Electric Immersion Water-Heaters IS 302 Part 2 Sec 201
718 Electric Iron IS 302 (Part 2/Sec 3)
719 Ballasted Lamps for General Lighting Services IS 15111 : 2002
720 Ac Static Transformer Operated Watt-Hour and Vat-Hour Meters, CLASS 0.2S & 0.5S IS 14697:2021
721 Ac Static Watt-Hour Meters, Class 1 & 2 IS 13779:2020
722 Ac Watt-Hour Meters, Class 0.5, 1 & 2 IS 13010 : 2002
723 Residual Current Operated Ciecuit-Breaker IS 12640 PART 2 : 2016
724 High Alumina Refractory Cement IS 15895 : 2018
725 Microfine Ordinary Portland Cement IS 16993 : 2018
726 Composite Cement IS 16415
727 Oil Well Cement IS 8229
728 Hydrophobic Portland Cement IS 8043
729 White Portland Cement IS 8042
730 Rapid Hardening Portland Cement IS 8041:1990
731 Super Sulphated Cement IS 6909
732 High Alumina Cement for Structural Use IS 6452 : 1989
733 Portland Slag Cement IS 455
734 Masonry Cement IS 3466
735 Ordinary Portland Cement IS 269
736 Portland Pozzolana Cement-Part 2 Calcined Clay Based IS 1489 PART 2
737 Portland Pozzolana Cement Fly-Ash Based IS 1489 PART 1:2015
738 Low Heat Portland Cement IS 12600:1989

Documents Required for Foreign Manufacturer Certification Scheme

The following is the list of required documents for FMCS: 

1. Application Form: A fully completed form as requested to apply for FMCS by BIS.

2. Proof of Legal Identity: incorporation certificate and registration of business in case of foreign manufacturers.

3. Authorized Representative details: Authorization letter including details regarding an authorized person of an Indian company authorized to collect the same and represent their identification along with address proof

4. Factory Layout: Complete layout of the manufacturing plant, including the manufacturing process

5. Quality Control Documents: Necessary to check the updated BIS Quality Control order on mandatory products. Detailed list of quality control apparatus and procedure. The names and qualifications of quality control people.

6. Test Reports: The test reports of products that are issued by a BIS-recognized laboratory certifying conformity with relevant Indian Standards (IS).

7. Product Details: Technical specifications and drawings of the product along with raw material utilization used in the product.

8. Manufacturing Process: Description with flowcharts.

9. BIS Standard Mark Agreement: Agreement copy signed about the utilization of BIS Standard Mark on marked products.

10. Undertaking: declaration of conformity to the Indian Standards and undertaking that shall continue to abide by the provisions contained under the BIS rules.

11. Factory Inspection Support: Documents to facilitate factory inspection, including travel and logistics details for BIS officials.

12. Regulatory Approvals: any additional certifications or approvals required for the product in the importing country.

 

What is the duration/timeline for getting your product FMCS certified?

The BIS FMCS certification process generally takes 8–12 weeks. Application review takes 1-2 weeks, the factory inspection 2–4 weeks, and product testing 4-6 weeks. BIS reviews the reports in 2–3 weeks before granting the license.

 

How do I renew the BIS license under FMCS?

A BIS license can be renewed for up to five years just by filling out a renewal application form along with supporting documents with the renewal and marking fee. Inclusion of New Variety in the Existing License. BIS Licensee can include new varieties, grades, types, and classes in the existing license by the following procedure:

  • Submission of Original test report (Tested in BIS-recognized lab)
  • In-house test report
  • Details of testing equipment
  • Inclusion fee, etc.

 

Advantages of BIS Certification for Foreign Manufacturers

There are some evident advantages for BIS certification of foreign manufacturers; those are:

  • Additional Growth Opportunities: FMCS unlocks avenues to long-term profitability as international manufacturers who trade in India will adhere to the rules and regulations of India. They, besides continuing to build success and growth opportunities, would now be able to initiate setting up sustainable relationships with the Indian stakeholders and customers.
  • Fosters Quality of Product: This certification encourages the production of quality products since it assures local consumers and businesses of the authenticity of goods and products manufactured overseas. It creates a distinction for foreign manufacturers above their less deserving competitors. It symbolizes excellence and dependability and thus gives identified businesses more advantages over competitors in the Indian market.
  • Increases User Trust: It increases customer trust through the assurance that international companies are adapting to Indian standards and reduces the chances of non-compliance. Besides this, FMCS increases market shares and sales as well as the consumers' trust in India.
  • Saves Time: By giving certification to overseas producers, FMCS saves them time and cost. Besides this, FMCS accepts international standards, thereby making it easier for overseas producers to follow Indian legislation.
  • Saves the money of foreign producers: The FMCS accreditation would have benefited the foreign producers while they promoted their products in the Indian market as well, bringing about savings in less duplication of testing and certification requirements.

 

These benefits help international manufacturers who follow Indian norms and laws in selling their products in the Indian market. By helping international manufacturers understand Indian rules, regulations, and standards, the FMCS plan facilitates international manufacturers entering the Indian market and manufacturing products of higher safety and quality.

 

Role of Authorized Indian Representative (AIR)/ ERCS

The following are the requirements for designating an authorized Indian representative (AIR). To obtain a BIS FMCS Certification, foreign applicants must designate an Authorized Indian Representative (AIR) to conduct business in India. A local office is crucial in India. AIR is responsible for organizing and submitting certification applications as the local agent. You can ask them questions as well.

 

The applicant (foreign manufacturer) shall nominate an authorized Indian representative (AIR) for the operation of the BIS license. For nominating an AIR, the applicant shall ensure the following points:

  1. The authorized Indian representative (AIR) shall be an Indian resident.
  2. The nominated AIR is representative of one manufacturing firm only and cannot represent another foreign manufacturer(s) as AIR under the BIS Conformity Assessment schemes.
  3. AIR shall not have any conflict of interest concerning their role as AIR with testing of samples in third-party laboratories.
  4. AIR must be graduated by qualification and be able to understand the provisions of the BIS Act, 2016 the rules and regulations framed thereunder and the implications thereof.
  5. AIR shall declare his consent to be responsible for compliance with the BIS Act, Rules, Regulations, and Terms & Conditions as written in the BIS License, Agreement, Undertaking, and indemnity bond executed on behalf of the foreign manufacturer in connection with the grant and operation of the BIS license.
  6. In case of a change of the AIR or address, the manufacturer shall be required to inform BIS in advance.

 

As an established BIS FMCS consultant, ERCS Private Limited assists in obtaining FMCS  certifications from all relevant departments and agencies, as well as any necessary licenses and approvals. With this dedication, we can guarantee a seamless process with few delays to make sure your product complies as much as feasible with market standards.

 

Conclusion

Since the product satisfies Indian safety and quality standards, importation requires a BIS certificate. Consequently, product testing, inspections, and application filing were necessary. These procedures keep dangerous products off the market while guaranteeing the delivery of trustworthy and secure products. These processes increase consumer confidence, make markets more accessible, and avoid any legal problems. The importers will receive assistance while meeting the requirements if they follow these guidelines.



Frequently Asked Questions (FAQs)

Only Foreign manufacturers whose company are located outside India and want to export their product in India.

Please click to get mandatory product list under scheme 1

In order to know the procedure of getting BIS FMCS license, Please follow the above mentioned process.

Yes. Foreign applicant has to nominate AIR who must be Indian resident with his consent to be responsible for the compliance to the provisions of the BIS Act, norms, terms and conditions included in the BIS License and Agreement.

It is compulsory to foreign applicant to do the payment in USD. SAARC Countries can do the payment in either in USD or INR.

It cannot be accepted. Only as per applicable Indian standard test report will be applicable.

Separate application for each product / ISS is required to be submitted even for same factory unit.

No. Only foreign manufacturer can apply for BIS license under FMCS.

Separate application for each product / ISS is required to be submitted even for same factory / Manufacturing location.

BIS product certification is offered under the ISI mark scheme by the Foreign Manufacturer Certification Scheme (FMCS). Since 1950, the ISI mark has been used to identify industrial items in India that meet standards.

Foreign Manufacturers Certification Scheme (FMCS)

For products to be introduced and sold on the Indian market, BIS Certification is required. The Bureau of Indian Standards (BIS) issues BIS Certification India or BIS Registration, which guarantees the dependability, safety, and quality of goods in compliance with Indian Standards (IS).

A foreign applicant has to nominate AIR, who must be an Indian resident with his consent to be responsible for compliance with the provisions of the BIS Act, norms, terms, and conditions included in the BIS FMCS License and Agreement.

No. Only foreign manufacturers can apply for BIS licenses under FMCS.

A separate application for each product/ISS is required to be submitted, even for the same factory unit.

Request A Quote

Need Expert Advice?
Feel Free to Connect with Us

Prompt reply within hours
Continued support

To give you the best compliance services in India, experienced BIS certification consultants at ERCS are ready to assist you at every stage of certification. Find out everything you need to know about the compliance your product requires to get into the Indian market and develop a trusted customer base.

Call to ask anything about Compliance

+91-9076611767, +91-9076611766

ERCS Private Limited Logo